Friday, 3 January 2014

More reflections on 2013

Eventually the replacement of the lead water main was competed, in late summer. It took longer than expected. The pipe upstairs leaked and dripped through the ceiling in my bathroom. The main pipe into my flat also leaked. It was a combination of the water pressure being increased from the mains in the street (new pipe... no pressure-deflating leakage) and the connections not having been properly sealed.
Now it all seems fine at last.
Another thing we did I have not already written about was the Grayson Perry Exhibition in Sunderland.
The post below lets you see and hear him talking about it. Enjoy!

No comments:

herbwormwoodsblog.wordpress.com Please visit there for latest news from Herbwormwood